Scheduling App Content Launches with Publishing Plans
Publishing plans let you prepare app page designs in advance and automatically publish them at a scheduled time, eliminating the need for manual updates on launch day. For example, you can prepare campaign pages and update your brand colors for major shopping events such as Black Friday and Cyber Monday, then automatically restore the app's original content when the campaign ends. You can also schedule a complete app redesign to go live at a specified time and become the app's new default content.
This guide introduces the available plan types and statuses and explains how to create plans, edit and publish plan content, confirm plans, and manage existing plans.
Understanding Publishing Plan Basics and Plan Types
Publishing plans involve key concepts such as default content, plan content, and publishing items, and come in two types: Event and Launch. The two types differ in when to use them, how they take effect, and how their time is set. This section explains these basic concepts and the main differences between the two plan types.
Key Concepts for Publishing Plans
Before using publishing plans, get familiar with the following concepts:
- Default content: The design content the app normally shows when no plan is active.
- Plan content: The design content that belongs to a publishing plan. Plan content is saved and edited separately from default content, so editing plan content doesn't affect default content.
- Publishing items: The content a plan covers, including Global settings (theme settings, brand kit, and fonts) and individual page types (such as Home page, Product list, and custom pages).
The Two Publishing Plan Types
When creating a plan, select one of the following plan types:
| Comparison | Event | Launch |
| When to use | Big sales, holiday campaigns, and other events with a clear start and end time | A full app redesign you'll use long term |
| How it takes effect | Shows the plan content during the plan time, then automatically returns to default content when it ends | At the start time, writes the plan content into the default content, where it stays permanently |
| Plan time | Requires a start time and an end time, up to 90 days | Only requires a start time |
| Pause and resume | Supported | Not supported |
| Note: The plan type can't be changed after you confirm the plan. To use a different type, terminate the original plan and create a new one. |
Understanding Publishing Plan Statuses and End Reasons
Each publishing plan shows its current status so you know whether it's in effect:
| Status | Description |
| Draft | The plan is saved but not yet confirmed. It doesn't take effect in the app. |
| Scheduled | The plan is confirmed, but its start time hasn't arrived yet. |
| Active | Event plans only. The current time is within the plan time, and the app is showing the plan content. |
| Paused | Event plans only. The plan was paused manually. While it's paused, the app shows default content. |
| Ended | The plan has ended and no longer takes effect. It can't be confirmed, paused, or resumed. |
Creating a Publishing Plan
To create a publishing plan:
-
From your SHOPLINE admin panel, go to Shopper App > Publishing plans, then click Create publishing plan in the upper-right corner.
- Complete the following settings under Details:
- Plan type: Select Event or Launch. This field is required and has no default option.
- Plan name: Enter a plan name, up to 50 characters. The name can't be the same as another plan that hasn't ended.
-
Set the time under Schedule:
- Start time: Required. It must be later than the current time.
- End time: Only shown when Event is selected. The end time must be later than the start time, and the event can last no longer than 90 days.
Note: Times are selected in 10-minute increments and shown in your browser's time zone. -
Under Items, click Add items, then select the content to include in this plan in the pop-up:
- Global settings: Includes theme settings, brand kit, and fonts. While the plan is in effect, global settings apply to all pages in your store, including pages not included in this plan.
- Page types: Such as Home page, Collections page, Product list, Product page, and Shopping bag. Page types with templates show the number of active templates, and the plan includes all active templates for that page type.
- Custom pages: Each custom page you created is listed separately.
Notes:
- You need to set the plan time before the Add items button becomes available.
- Home page and Global settings are added to or removed from a plan together. When you select one, the other is selected automatically.
- If an item is already used by another plan with an overlapping time, it can't be selected. Click View conflicts to see the name, status, and overlapping time of the plan using it.
- Click Add. The selected content is added to the plan's publishing items list.
- Click Save draft in the upper-right corner. You need to add at least one publishing item to save.
After saving, the plan enters Draft status, and you can start editing the plan content.
| Tip: The Edit plan content button next to a publishing item becomes available after you save the draft for the first time. To remove a publishing item, click the trash icon in its row. |
Editing and Publishing Plan Content
Plan content is saved separately from default content. You can edit plan content before or after confirming the plan. To edit and publish plan content:
- Open the App Design editor in either of the following ways:
-
On the plan details page, under Items, click Edit content for the relevant publishing item.
-
In the App Design editor, click the Content drop-down menu in the upper-left corner and select the plan you want to edit under Publishing Plans. You can search by plan name in the search box.
-
- Select the page you want to edit and complete the design. When you edit plan content, the page selector lists only the pages included in this plan.
- When you're done, click Publish to live store in the upper-right corner to publish the plan content to the live app.
| Important: Only plan content published to the live app is shown when the plan takes effect, or written into the default content for a launch. Changes that are only auto-saved, or only published to Snaplook, don't take effect. |
|
Notes:
|
Confirming a Publishing Plan
A plan must be confirmed before it automatically takes effect at the plan time. To confirm a publishing plan:
-
Click Confirm plan in the upper-right corner of the plan details page. The system checks the plan settings.
If there's a problem, the page shows what needs to be fixed, for example:
- The plan name or plan time doesn't meet the requirements.
- No publishing items have been added. The page shows "Add at least one item."
- A publishing item overlaps in time with another plan. The page shows "Unable to confirm plan for now" and lists the conflicting page types, the other plan's name, its status, and the overlapping time. After you change the publishing items or plan time, you can confirm again.
-
In the Confirm plan pop-up, review the Plan name, Start time, End time, Global settings, Pages, and Status once confirmed.
Note: If any publishing items have never been published to the live app, the pop-up lists them under The following items haven't been published to the live store:. This message doesn't stop you from confirming the plan, but keep the following in mind:
- Event: During the event, unpublished pages keep showing default content until you publish them in the editor. You can publish before or after confirming the plan.
- Launch: If you don't publish the relevant pages before the launch takes effect, those pages won't be updated. Make sure to publish them in the editor before the plan's start time.
- Click Confirm plan. Once confirmed, the plan enters Scheduled status and takes effect automatically at the start time.
| Note: Confirming a plan only locks the plan time and publishing items, not the content version. After confirming, you can keep editing and publishing plan content. When the plan takes effect, each page uses the content last published to the live app. |
Managing Publishing Plans
You can find and manage your plans in the publishing plan list, including changing plan settings, pausing or resuming events, terminating plans, and copying, discarding, or deleting plans.
Finding Plans in the Publishing Plan List
On the Shopper App > Publishing plans page, you can find plans in the following ways:
- Status tabs: Click All, Current, Draft, or Ended to view plans in that range.
- Filters: Use All items to filter plans that include a specific publishing item, or All statuses to filter plans by status.
The list shows each plan's Plan name, Items, Start time, End time, and Status. Click any row to open the plan details page.
Changing a Confirmed Publishing Plan
After a plan is confirmed, you can still change its plan name, plan time, and publishing items until it enters Ended status. To change a confirmed plan:
- In the publishing plan list, click the plan you want to change.
- Change the plan name, plan time, or publishing items. The plan type can't be changed.
- Click Confirm changes in the upper-right corner, review your changes in the pop-up, then click Confirm changes again.
After you change the start time, the plan status changes as follows:
- Scheduled plans: Stay Scheduled and take effect as usual at the new start time.
- Active events: Return to Scheduled after you confirm the changes. Pages temporarily show default content, and the plan takes effect again at the new start time.
- Paused events: Stay Paused. Even when the new start time arrives, you need to resume the plan manually for the plan content to be shown.
Pausing and Resuming Events
For Event publishing plans, you can pause the plan while it's Scheduled or Active, and resume it as needed.
| Note: Launch publishing plans can't be paused or resumed. |
To pause an event:
- On the plan details page, click Pause plan.
- In the pop-up, click Pause plan.
After pausing, the plan enters Paused status and no longer shows plan content. If the plan was active, customers see the default content of each page.
To resume a paused event:
- On the plan details page, click Resume plan.
- In the pop-up, click Resume plan.
After resuming, if the current time is still before the start time, the plan returns to Scheduled. If it's within the plan time, the app shows the plan content again.
| Note: A plan can't be resumed after its original end time has passed. |
Terminating a Publishing Plan
Plans in Scheduled, Active, or Paused status can be terminated. After termination, all pages in the plan return to their current default content. To terminate a publishing plan:
- Click … (more actions) in the upper-right corner of the plan details page.
- Select End plan.
- In the pop-up, click End plan.
| Important: After termination, the plan enters Ended status and can't be restored. |
Copying, Discarding, or Deleting a Publishing Plan
You can copy, discard, or delete publishing plans as needed:
-
Copy and create new draft: On the plan details page, click … and select Duplicate as draft, or click the copy icon in the More actions column of the list. All plans except Ended plans can be copied.
- The new draft includes all publishing items from the original plan, plus the latest edited content of each page (including unpublished changes).
- The new draft is named "Original plan name Copy," and its plan time is empty, so you need to set it again.
- All content in the new draft is treated as unpublished. To make it take effect, publish it again in the editor.
- Discard: Only for Draft plans. On the plan details page, click …, select Discard, then click Discard draft. After discarding, the draft and its content are removed without leaving any record.
- Delete plan: Only for Scheduled and Ended plans. Click the delete icon in the More actions column of the list, then click Delete. The plan and its plan content are deleted together and can't be restored. Active and Paused plans must be terminated before they can be deleted.
Understanding Time Conflicts and Execution Order for Publishing Plans
When multiple publishing plans include the same publishing item, the system checks for conflicts based on plan type and time, and applies the following rules:
- Between Event plans: If the event times for the same publishing item overlap, the system treats it as a conflict, and the plan can't be confirmed. Event time includes the start time but not the end time. So if one event's end time is the same as another event's start time, it isn't a conflict.
- Between Launch plans: If multiple launch plans for the same publishing item have the same start time, the system treats it as a conflict, and the plan can't be confirmed. If the start times are different, the system runs them in order of start time, and the later launch's content overwrites the earlier launch's content.
- Between Event and Launch plans: The two types are never treated as conflicting. If their run times overlap, the Event content is shown first.
When multiple launch plans include the same page type, or all include global settings, the system runs them in order of start time and follows these rules:
- Waiting for the previous launch to finish: If the previous launch hasn't finished, the next launch stays Scheduled even after its start time arrives. The plan details page shows the name of the launch ahead of it and why it's waiting. You can click View plan to open the previous launch's details page. Once the previous launch ends or is terminated, the next launch continues automatically, with no need to confirm it again.
- Launch temporarily can't take effect: If a launch has reached its start time but its plan content temporarily can't be written into the default content, the plan details page shows a message. The system retries automatically, and page content stays the same in the meantime. You don't need to do anything. If you don't want to keep waiting, you can terminate the plan.
Important Notes for Publishing Plans
When using publishing plans, keep the following rules and limitations in mind:
- Product data: Product prices, inventory, flash sales, and other data always reflect their current actual status and don't switch with publishing plans.
- Bottom navigation: If a plan includes Home page, the bottom navigation on all app pages uses the plan's version while the plan is in effect. If a new entry in the bottom navigation points to a page not included in the plan, customers who tap it see that page's default content.
- Page update prompt: When a plan starts or ends, customers browsing the app see a Page content updated prompt on affected pages. They can tap Tap to view to see the latest content.
- Launch rules: A launch only updates publishing items that have been published to the live app. Pages not published to the live app stay the same.
- Page template changes: When you add a page template, the system automatically adds it to all plans that haven't ended, using the template's current default content as its starting content. When you delete a page template, its content in plans that haven't ended is deleted too.
- Custom page deletion limits: A custom page used by a plan that hasn't ended can't be deleted. Remove the page from the relevant plans first, or terminate those plans.
- Snaplook preview: In Snaplook, you can choose a specific point in time to preview how the app will look at that time. For details, see "Previewing Your Store App Using Snaplook."
FAQs About Publishing Plans
Q1: Why didn't the page update when my launch plan reached its start time?
A launch only updates plan content that has been published to the live app. Make sure you clicked Publish to live store in the editor for the relevant publishing items.
- Plan has ended: If the end reason shows No published content, none of the plan's publishing items were ever published to the live app, so page content stayed the same.
- Plan is still Scheduled: The previous launch may not have finished yet. The system continues automatically once it ends or is terminated. If the system temporarily can't write the plan content, it also retries automatically. Check the message on the plan details page for the specific reason.
Q2: Can I still change plan content after confirming the plan?
Yes. Confirming a plan doesn't lock the content version. You can still change and republish plan content in the editor. When the plan takes effect, the system uses the version last published to the live app.
Q3: Why didn't the content of a copied plan take effect?
Content in a plan created with Duplicate as draft is always treated as unpublished. Click Publish to live store in the editor for each publishing item again so the content is shown when the plan takes effect.
Q4: If I change the start time of a paused event, does the plan resume automatically?
No. Changing the start time doesn't lift the pause. Click Resume plan manually, and the system will then decide when to show the event content based on the new plan time.